New business premises waiting for a fibre leased line install

    Your fibre is months away. Your opening date isn't moving.

    Integra Bridge gets your business online in 10 working days — bonded Starlink + 4G/5G at fibre-class speeds — then stays on as your failover when the leased line finally lands.

    Talk to Sales
    SLA-backedUK engineersTrusted by businesses across the UK99.5% uptime

    The gap, in numbers

    30–90 working days

    typical UK leased line install

    10 working days

    Integra Bridge live

    £0 wasted

    Bridge becomes your failover

    Trusted by businesses across the UK

    View all customer stories →

    How the wait actually goes

    Order day to fibre day — and what we do in between.

    The leased line still arrives. You just don't sit dark while it does.

    Week 0

    You order your leased line.

    Quote signed, Openreach starts the clock.

    Week 2

    Integra Bridge live.

    Your business is online at up to 500Mbps.

    Weeks 2–14

    Trade as normal.

    Wayleaves, surveys, civils — none of it stops you working.

    Fibre day

    Seamless cutover.

    Traffic moves to the leased line in a planned window.

    After

    Bridge stays as failover.

    One outage paid for the whole thing.

    Week 0

    You order your leased line.

    Quote signed, Openreach starts the clock.

    Week 2

    Integra Bridge live.

    Your business is online at up to 500Mbps.

    Weeks 2–14

    Trade as normal.

    Wayleaves, surveys, civils — none of it stops you working.

    Fibre day

    Seamless cutover.

    Traffic moves to the leased line in a planned window.

    After

    Bridge stays as failover.

    One outage paid for the whole thing.

    Why installs slip

    Three things slow every fibre install. None of them are negotiable.

    Wayleave agreements

    Openreach needs landlord and neighbouring-land signatures to run fibre to your premises. Each one can sit on a desk for weeks — and the install can't book until they're all signed.

    Excess construction & civils

    New ducting, road closures, traffic management. Quotes routinely come back £15–50k, and the works themselves add weeks to the build programme on top of the survey queue.

    Survey-to-install queue

    Desktop survey, site survey, planning, build, commissioning — each stage books weeks out. One slip in the chain pushes everything that follows back another month.

    None of it is in your control. Being online anyway is.

    Which sounds like you?

    Two situations. Two answers. One platform.

    Both engineer-installed, bonded, SLA-backed and live in 10 working days — but they solve different problems.

    New business premises with bridge connectivity while fibre is provisioned

    Integra

    Bridge

    We've ordered fibre — it's just not coming fast enough.

    New premises, relocation, or an install date that keeps slipping. Integra Bridge gets you live in 10 working days, then cuts cleanly to your leased line when it lands — and stays on as failover.

    While you wait · Failover after

    Explore Integra Bridge
    Cellular mast — bonded 4G/5G as a permanent business connection

    Integra

    SD-WAN

    Honestly, fibre might never make sense here.

    Quote came back £15k+, or the cabinet's miles away. Integra SD-WAN bonds multiple 4G/5G networks into a permanent business connection — up to 500Mbps with static IPs and full UK engineer support.

    Permanent · Bonded 4G/5G

    Explore Integra SD-WAN

    In the meantime

    You're not running on a stopgap. You're running on a business connection.

    Everything a fibre leased line would give you — minus the wait.

    Up to 500Mbps

    Fibre-class speeds, bonded across multiple bearers.

    99.5% uptime SLA

    Backed by service credits, monitored 24/7.

    Static IPs included

    No CGNAT. VPN, CCTV and inbound apps work properly.

    VoIP, EPOS & cloud

    Card machines, phones, cloud apps — engineered for business traffic.

    UK engineers

    Phone and WhatsApp support from the team that installed your kit.

    One install, one day

    Engineer attends site once, commissions everything before they leave.

    Case studies

    Businesses that stopped waiting.

    FAQ

    Waiting for fibre — what people ask

    Availability Checker

    Check coverage in 60 seconds

    Tell us where you are and we'll see what we can deliver.

    Your details

    So we can send you your results

    Open on time. Every time.

    Live in 10 working days. Fibre-class speeds. Becomes your failover when fibre lands.

    We use cookies and similar technologies to help personalise content, tailor and measure ads, and provide a better experience. By clicking 'Accept All' or turning on an option in 'Storage Preferences', you agree to this as outlined in our Privacy & Cookies Policy. To change preferences or withdraw consent, please update your 'Storage Preferences'.

    Call UsCheck Availability