Construction Site Internet. Live in 14 Days.
Portable 4G/5G connectivity for active sites. Up to 350Mbps download, 100Mbps upload. Monthly contracts. Kit redeploys when you move on.
Why Sites Stay Disconnected
The connectivity gap costs you days
Active sites have an immediate problem. Standard ISPs aren't built for it.
No Utilities, No Service
Openreach won't come to a site without power and a permanent address. So you wait. We don't need either.
Welfare WiFi Can't Carry It
BIM uploads, video calls, drone footage, CCTV — a £30 hotspot chokes the moment everyone logs on.
12-Month Contracts on a 6-Month Site
Most ISPs lock you in for the duration of someone else's contract — not yours. We don't.
Kit That Goes In The Skip
Site finishes, the router gets binned. Ours redeploys to your next project — at no extra cost.
Built for how sites actually run
Not a residential router with a hi-vis sticker. Engineered for construction.
Live in 14 Days
Survey, ship, install, online. No waiting on Openreach, no wayleaves, no trenching.
Real Download Speeds
Bonded 4G/5G via cellular SD-WAN. Big enough for BIM, video calls, and drone footage simultaneously.
Upload That Doesn't Choke
Where most cellular fails. We bond multiple SIMs to give you upload performance that handles CCTV and progress photos without breaking a sweat.
Three reasons construction PMs choose us
Most ISPs sell broadband. We solve site connectivity.
No utilities? No problem.
Openreach won't come to a site without power and a permanent address. We will. Bonded 4G/5G via cellular SD-WAN — no trenching, no wayleaves, runs from a 12V supply.
Built for how sites actually work.
Monthly agreements that flex with your programme. Kit redeploys to your next site. CCTV-ready static IPs included as standard.
350Mbps / 100Mbps upload.
Big enough for BIM file transfers, video calls, drone footage, and remote CCTV — without choking the welfare WiFi.
From enquiry to live in 14 days
Survey
Drone or desktop survey of the site. We map signal, identify the right cells, and design the kit list.
Build & Ship
Pre-configured in our UK workshop. Tested end-to-end before it leaves us. Couriered to site or hand-delivered.
Live & Monitored
30–60 minute install. UK NOC monitors it 24/7. You get a single number when something goes wrong.
Featured Customer
McGee Construction
350Mbps connectivity rolled out across some of London's largest active demolition and construction sites. CCTV, welfare cabins, site offices, and BIM uploads — all on a single bonded 4G/5G connection that redeploys when the site moves.
Verified throughput on site
From survey to live
London's biggest sites · CCTV-ready · BIM uploads · No fibre needed
Also Worth Reading
WRSA Steam Rally — 500Mbps in a field for 8,000 visitors
If we can put half a gigabit into a field for a weekend event, we can put it on your site for a year. Same kit, same engineers, same approach.
Trusted on active sites by
McGee · Seacon Group · WB Power · and 100+ UK businesses
Frequently Asked Questions
From a confirmed survey, we ship and install within 14 days as standard. Many sites go live faster — McGee's London sites have been turned around in a week. We pre-configure everything in our workshop so the on-site install is typically 30–60 minutes.
Get your site connected in 14 days
Tell us where you're building. We'll come back within one working day with a kit list, a price, and a go-live date.
Related Services