---
title: "McGee Construction Case Study — Integra Networks"
description: "McGee Construction got 350Mbps+ download and 100Mbps+ upload speeds with multi 4G/5G bonded connections. Deployed in 10 working days."
lang: en
json-ld: |
  [
    {
      "@context": "https://schema.org",
      "@type": "Organization",
      "name": "Integra Networks",
      "url": "https://www.integra-networks.co.uk",
      "logo": "https://www.integra-networks.co.uk/favicon.png",
      "description": "Business-grade connectivity solutions for UK businesses. SD-WAN, Starlink, leased lines, 4G/5G bonding, and managed Wi-Fi — installed in 10 working days.",
      "address": {
        "@type": "PostalAddress",
        "addressCountry": "GB"
      },
      "sameAs": [
        "https://www.linkedin.com/company/integra-networks"
      ],
      "contactPoint": {
        "@type": "ContactPoint",
        "contactType": "sales",
        "url": "https://www.integra-networks.co.uk/contact"
      }
    },
    {
      "@context": "https://schema.org",
      "@type": "WebSite",
      "name": "Integra Networks",
      "url": "https://www.integra-networks.co.uk"
    }
  ]
---

[![Integra Networks](/assets/integra-logo-C3q8Ehve.svg)](/)

Services

Sectors

[Insights](/insights)[Customers](/customers)[Contact](/contact)

[Availability Checker](/check)

![McGee Construction at Battersea Power Station](/assets/mcgee-hero-CEa6uflU.webp)

[Customers McGee Construction ](/customers)

# Building at Speed: 350Mbps Connectivity for London's Biggest Sites

McGee Construction needed fast upload speeds for site managers. Integra delivered 350Mbps+ download and 100Mbps+ upload. Deployed in days.

Company

McGee Construction

Industry

Specialist Engineering Contractor

Location

London

![McGee Construction](/assets/mcgee-logo-x9ka6D0Y.png)

Description

McGee Construction, a leading specialist engineering contractor based in London, has excelled in innovative engineering solutions since 1959, tackling complex challenges across the capital.

## The Problem: Waiting Months for Connectivity You Need Today

McGee Construction manages some of London's toughest builds. Sites are often underground, temporary, or located where infrastructure doesn't exist yet.

Traditional leased lines take 12 weeks to install and cost a fortune. Project managers can't wait that long. They need to upload large files instantly, communicate with teams in real time, and move rigs if the site changes. Slow internet doesn't just annoy them—it costs them money.

## What They Needed: Fast Upload, Instant Deployment, Reliable Everywhere

McGee's team needs to push 50GB files from site to HQ instantly. Architectural plans, progress photos, equipment specs—all moving throughout the day. Download speed matters. But upload speed wins jobs.

They needed connectivity installed in a week, not three months. And it needed to work whether they were at Battersea Power Station, under the Thames, or in a basement in the City.

> "We got live connectivity in a week. No months of waiting, no huge installation bills. And the upload speeds are massive—our project managers can work like they're in the office. That's what makes Integra different."

Chris Pyne, Head of IT, McGee Construction

## The Solution: Multi 4G/5G Bonded Over SD-WAN

Integra bonded multiple 4G/5G connections together over SD-WAN. Result: 350Mbps+ download and 100Mbps+ upload. Where there are multi 5G connections available, they unlock even higher speeds.

Installation took a week. Wi-Fi networks went live across site. Project managers could upload files in minutes instead of hours. And if the site moved? The hardware moved with it.

No waiting for BT. No six-figure bills. No infrastructure that becomes stranded when the project ends. Just connectivity that works where and when they need it.

Solutions Delivered

[Integra SD-WAN ](/integra-sd-wan)[Business Wi-Fi ](/business-wifi)[Wireless Distribution ](/wireless-distribution)

More Stories

## Explore Other Case Studies

[

![Royle Farm Business Park](/assets/royle-farm-hero-C7hXE3Bo.webp)

Customer Story 

Royle Farm Business Park

### From Farm to fibre: Royle Farm Business Park

Read Story 



](/customers/royle-farm)[

![WRSA Steam Rally Festival](/assets/steam-rally-hero-ZDQy0RJF.webp)

Customer Story 

WRSA Steam Rally Festival

### Steam at Scale: 500Mbps for 8,000 Visitors

Read Story 



](/customers/steaming-ahead-with-enhanced-festival-connectivity)[

![WB Power Services](/assets/wb-power-hero-BOFlG2lU.avif)

Customer Story 

WB Power Services

### Dodging the £50K Bill: SD-WAN at Chorley Depot

Read Story 



](/customers/wb-power-services)[

![Little Quarry Glamping](/assets/little-quarry-hero-CDY4_pbZ.webp)

Customer Story 

Little Quarry Glamping

### Luxury Pods, Real Internet: Little Quarry's Breakthrough

Read Story 



](/customers/little-quarry-glamping)[

![Carbee Ltd](/assets/carbee-hero-Tm09rKOC.webp)

Customer Story 

Carbee Ltd

### From 0.1Mbps to 300+: Rural Car Dealer Gets High-Speed

Read Story 



](/customers/revving-up-connectivity-carbees-journey-to-high-speed-internet)[

![Royal Harwich Yacht Club](/assets/rhyc-hero-Cm9Xp1m6.webp)

Customer Story 

Royal Harwich Yacht Club

### Full Sail: 300Mbps in the Middle of Nowhere

Read Story 



](/customers/sailing-through-connectivity-challenges-the-royal-harwich-yacht-clubs-journey)[

![UKHarvest](/assets/ukharvest-hero-Biwr-Ls6.webp)

Customer Story 

UKHarvest

### Food Rescue Needs Fast Internet: UKHarvest's Win

Read Story 



](/customers/fast-track-connectivity-ukharvests-digital-transformation)[

![Thinking Anglers](/assets/thinking-anglers-hero-AfICdKu0.jpg)

Customer Story 

Thinking Anglers

### YouTube Creators Need Upload Speed: They Got It

Read Story 



](/customers/casting-the-net-wide-a-connectivity-transformation)[

![Atura Proteins](/assets/atura-hero-CwMtlBTS.webp)

Customer Story 

Atura Proteins

### Plant Proteins Powered by Real Connectivity

Read Story 



](/customers/revolutionising-connectivity-for-plant-protein-pioneers)[

![APJ European](/assets/apj-hero-DjNpV25u.webp)

Customer Story 

APJ European

### A Warehouse in a Digital Blackspot: Solved

Read Story 



](/customers/revitalising-global-distribution-apj-europeans-digital-transformation)[

![Seacon Group](/assets/seacon-hero-D_KZ-Crv.webp)

Customer Story 

Seacon Group

### Port Operations Transformed: Comprehensive Connectivity

Read Story 



](/customers/seacon-group)

## Let's see what we can do for you

Business connectivity in 10 working days — wherever fibre can't reach.

[Let's talk](/contact)

[![Integra Networks](/assets/integra-logo-white--jcfSj7m.png)](/)

Integra Networks — business connectivity, no fibre needed.

#### Connectivity

-   [Integra SD-WAN](/integra-sd-wan)
-   [Integra Bridge](/integra-bridge)
-   [Starlink Installation](/starlink-installation)
-   [Managed SIM Services](/managed-sim-services)
-   [Pricing](/pricing)

#### Standard Connectivity

-   [Leased Lines](/leased-lines)
-   [Managed Internet](/managed-internet)
-   [SoGEA Broadband](/sogea)
-   [4G/5G Backup](/cellular-backup)
-   [Business Mobiles](/business-mobiles)

#### Solutions

-   [Business Wi-Fi](/business-wifi)
-   [Unified Communications](/unified-communications)
-   [Managed Firewall](/managed-firewall)
-   [Business Continuity](/business-continuity)

#### Infrastructure

-   [CCTV](/cctv)
-   [Wireless Distribution](/wireless-distribution)
-   [Network Infrastructure](/network-infrastructure)

#### Company

-   [Customer Stories](/customers)
-   [Wholesale](/wholesale)
-   [Contact](/contact)
-   [Support](/support)

#### Resources

-   [Availability Checker](/check)

#### Talk to Us

[connect@integra-networks.co.uk](mailto:connect@integra-networks.co.uk)[0203 388 7111](tel:02033887111)

[](https://www.instagram.com/integra_networks)[](https://www.facebook.com/IntegraNetworksUK)

86–90 Paul Street

London, EC2A 4NE

ICO registered UK GDPR compliant 

© 2026 Integra Networks Limited. All rights reserved. 

[Privacy Policy](/privacy-cookies)[Terms](/terms)[SLA](/sla)

Company No. 13467217 

[Call Us ](tel:02033887111)[Check Availability ](/check)